As part of its continued development in France, EDF Energies Nouvelles announces the commissioning of the Plateau d’Andigny and the Trecon-Clamanges wind farms, with a total installed capacity of 25 MW.
The Plateau d’Andigny wind farm is located in the Picardy region, at the crossroads of four communes in the Aisne department: Vaux-Andigny, Molain, Vallée-Mulâtre and Saint-Martin-Rivière. It comprises seven Siemens wind turbines with an installed capacity of 21 MW and is co-owned by EDF Energies Nouvelles and Diamond Generating Europe.
The Trecon-Clamanges wind farm (4 MW) is located in the Champagne-Ardenne region, in the communes of Villeseneux and Trecon in the Marne department. It comprises two Vestas turbines with a capacity of 2 MW each.
The combined production of both wind farms is equivalent to the annual electricity consumption of more than 22,000 inhabitants.
MEDIA RELATIONSManon de Cassini-Hérail ▪ Tel : +33 {0} 1.40.90.48.22 ▪ e-mail : manon.decassini-herail@edf-en.com
Clarisse Placidoux ▪ Tel : +33 {0} 1.40.90.49.46 ▪ e-mail : clarisse.placidoux@edf-en.com