Welcome > News > Fécamp offshore wind farm: 100% wind turbines installed

share

Fécamp offshore wind farm: 100% wind turbines installed

The last wind turbine of the Fécamp offshore wind farm, the first offshore wind farm in Normandy, has been installed this Monday March 25. In total, 71 wind turbines have been installed since July 2023.

After a testing phase, the latest wind turbines should produce electricity in the coming weeks.

The park's 71 wind turbines, with a power of 500 MW, are located between 13 and 24 km from the Normandy coast. The Fécamp offshore wind farm will produce the equivalent of the annual electricity needs of around 770,000 inhabitants, or 60% of the population of Seine-Maritime.

Learn more about https://parc-eolien-en-mer-de-fecamp.fr/.