EDF Renouvelables

Solar power plants

Solar power plants

1 / 10

How long does a solar power plant produce electricity?

2 / 10

True or false ? Some solar panels are double-sided.

3 / 10

In 2023, EDF Renewables inaugurated its first floating solar power plant in France in the Hautes-Alpes. But why float solar panels?

4 / 10

What material are the floats of a floating solar panel made of?

5 / 10

True or false ? Less than 50% of a solar panel is recyclable.

6 / 10

A solar power plant with 99,000 panels (12MW) can produce the equivalent of the annual electricity consumption of how many inhabitants?

7 / 10

Where is the largest solar power plant in the world?

8 / 10

Floating solar panels are not the same as those on land.

9 / 10

How long does it take to develop a ground-mounted solar power plant project?

10 / 10

True or false ? A solar power plant is supervised 7 days a week, 24 hours a day by the control center.

Your score is

The average score is 61%

0%

EDF Renewables - Japan

Menu

About

Since 2022, EDF Renewables has been developing offshore wind projects in Japan. 

The objective: to contribute to the country's energy transition.