The Fécamp offshore wind farm

The Fécamp offshore wind farm

1 / 10

What percentage of the annual electricity consumption of the inhabitants of Seine-Maritime will the Fécamp offshore wind farm be able to supply (power 500 MW)?

2 / 10

At what minimum distance from the coast will the first wind turbines in the park be located? 

3 / 10

What is the maximum height at the blade tips of the wind turbines at the Fécamp offshore wind farm? 

4 / 10

The area off Fécamp was chosen to host the wind farm because of: 

5 / 10

In total, how many kilometers of cables are needed to bring electricity from the offshore wind farm to land?

6 / 10

Check the number of jobs mobilized in Normandy for the construction of the Fécamp offshore wind farm?

7 / 10

In the Fécamp offshore wind farm, we will be able to:  

8 / 10

What type of foundation do the wind turbines of the Fécamp offshore wind farm rest on?

9 / 10

How long does it take on average to install a wind turbine on its offshore foundation? 

10 / 10

True or false ? The Fécamp offshore wind farm will be the first to be built in Normandy? 

Your score is

The average score is 51%

0%